Long train

B 177.4 / RP 3
Long train
Format : Downloadable
Ed. no.1 , March 2020
  • Special price info

    Please note that prices will reflect all eventual discounts as soon as you are logged on.

    Do not hesitate to contact us for any further information.

  • €400.00 excl. VAT

    Product Information

    Details

    This report documents the results of simulations carried out within the context of the Long Train project. The simulations were carried out in accordance with the methodology described in UIC Leaflet 421, comparing “reference trains” with new trains formed by coupling between two and four trains. The results demonstrate the need to increase the number of traction units when overall train length increases. In trains of up to 700 m — and up to 1,000 m in some cases — a train consist of two traction units is appropriate. However, in longer trains of 1,500  m and above, four traction units are required. All of the results obtained from the simulations may change depending on the technology used for the distributed power system, as well as the minimum track radius and the admissible longitudinal compressive forces of the wagons.





    ISBN978-2-7461-2968-9
    Pages28

    Table of content

    This web site uses cookies. By continuing to use this website you are giving consent to cookies being used. For information on cookies and how you can disable them visit our Privacy Policy